Quieter Home Program Phase 14 Group 11
Multi Family project in San Diego, California. Contacts available: owner.
Project overview
Scope: Site work and renovation of a multi-residential development in San Diego, California. Completed plans call for the renovation of a multi-residential development. Online Q&A Online Q&A Yes Q&A Deadline 09/01/2026 2:00 PM (PDT) Notes: Bid Date: 09/21/2026 02:00PM San Diego County Regional Airport Authority, CA Pre-Bid Meeting: 08/25/2026 10:00AM https://teams.microsoft.com/meet/243617479227795?p=2e14dKe9DROb7oFWHa Development include(s): Site Work, Renovation Details: [Division 2]: Building Demolition, Hazardous Material Abatement, Shoring, Grading, Excavation, Slope Protection & Erosion Control, Tunneling, Paving & Surfacing, Water Systems, Wells, Sewerage & Drainage, Irrigation, Landscaping. [Division 3]: Concrete Formwork, Concrete Reinforcement, Structural Concrete. [Division 4]: Clay Unit Masonry, Concrete Unit Masonry, Glass Block Masonry. [Division 5]: Structural Steel, Metal Decking, Cold Formed Metal Framing, Metal Fabrications. [Division 6]: Rough Carpentry, Prefabricated Structural Wood, Finish Carpentry, Architectural Woodwork. [Division 7]: Waterproofing, Insulation, Firestopping, Shingles, Membrane Roofing, Sheet Metal Roofing. [Division 8]: Metal Doors, Wood Doors, Metal Windows, Wood Windows, Plastic Windows, Hardware, Glass & Glazing. [Division 9]: Lath & Plaster, Stucco, Drywall/Gypsum, Tile, Terrazzo, Acoustical Walls, Wood Flooring, Carpet, Painting, Wall Coverings. [Division 10]: Louvers & Vents, Fireplaces & Stoves, Lockers, Protective Covers, Toilet & Bath Accessories. [Division 11]: Audio-Visual Equipment, Loading Dock Equipment. [Division 12]: Window Treatment, Multiple Seating. [Division 14]: Elevators, Moving Stairs & Walks, Material Handling Systems, Hoists & Cranes. [Division 15]: Mechanical Insulation, Plumbing Fixtures, Water Heaters, HVAC Pumps, Furnaces, Heat Pumps, Air Handling, Ductwork. [Division 16]: Service/Distribution, Interior Lighting, Alarm & Detection Systems.
Categories
Similar multi family projects in California
2817 South El Camino Real Mixed-Use
Plans call for the demolition of an existing Burger King restaurant and the construction of an eight-story, 211,450-square-foot mixed-use building. Th...
Euclid Avenue Mixed-Use
Plans call for the construction of two six-story residential and mixed-use buildings containing 430 residential units and 2,074 square feet of ground-...
East Avenue South and 42nd Street East Apartments
Plans call for the construction of a residential development with 160 affordable multifamily units across two three-story buildings. Units will featur...
1058 North Kingsley Drive Apartments
Plans call for the demolition of existing buildings and construction of a six-story residential development with 76 apartment units. 75 of the units w...
1650 Westwood Boulevard Apartment
Plans call for the demolition of an existing building for the construction of an affordable 31-unit, 20,036-square-foot apartment building. There will...
Olympia Hotel Apartments Renovation
Plans call for the renovation of an existing affordable residential hotel.