Haven on the Hill Housing Project
Multi Family project in San Andreas, California. Contacts available: owner, architect.
Project overview
Scope: Site work and renovation of a multi-residential development in San Andreas, California. Completed plans call for the renovation of a 62,683-square-foot multi-residential development. Question Deadline08/25/2026Questions concerning the Contract Documents shall be submitted through the Questions feature of the solicitation in Public Purchase. The Haven on the Hill Housing Project consists of modifications to an existing facility intended to improve accessibility and prepare the property for its intended programmatic use. The Work includes modifications to exterior and interior portions of the facility, including accessible parking and routes of travel , building access, restroom facilities, kitchen and laundry areas, interior components, and associated building systems as shown or specified in the Contract Documents. The Work also includes incidental demolition, repair, restoration , finishing , testing, cleanup, and other activities reasonably necessary to provide a complete and functional installation in accordance with the Contract Documents. The building will be vacant during construction of Phase 1. The Contractor shall nevertheless maintain site security and protect the existing facility and improvements throughout performance of the Work. Bonds: 10% Bid Bond, Certified Check required. Notes: Bid Date: 09/04/2026 03:00PM Public Purchase (Electronic Submission). Bids will be opened publicly following expiration of the bid submission deadline in the manner identified in the solicitation. Mandatory Pre-Bid Meeting: 08/21/2026 10:00AM Pre-bid Conference Location Haven on the Hill , 556 Toyon Drive, San Andreas , Ca 95249. Development include(s): Renovation, Site Work Details: [Division 2]: Building Demolition, Grading, Slope Protection & Erosion Control, Paving & Surfacing, Water Systems, Sewerage & Drainage, Irrigation. [Division 4]: Clay Unit Masonry, Stone. [Division 5]: Metal Decking. [Division 7]: Waterproofing, Shingles, Skylights. [Division 8]: Hardware. [Division 9]: Drywall/Gypsum, Painting. [Division 10]: Louvers & Vents, Interior Signs. [Division 15]: Mechanical Insulation, Plumbing Fixtures, Water Heaters, Air Handling, Ductwork. [Division 16]: Interior Lighting, Exterior Lighting, Emergency Lighting, Alarm & Detection Systems.
Categories
Similar multi family projects in California
2817 South El Camino Real Mixed-Use
Plans call for the demolition of an existing Burger King restaurant and the construction of an eight-story, 211,450-square-foot mixed-use building. Th...
Euclid Avenue Mixed-Use
Plans call for the construction of two six-story residential and mixed-use buildings containing 430 residential units and 2,074 square feet of ground-...
East Avenue South and 42nd Street East Apartments
Plans call for the construction of a residential development with 160 affordable multifamily units across two three-story buildings. Units will featur...
1058 North Kingsley Drive Apartments
Plans call for the demolition of existing buildings and construction of a six-story residential development with 76 apartment units. 75 of the units w...
1650 Westwood Boulevard Apartment
Plans call for the demolition of an existing building for the construction of an affordable 31-unit, 20,036-square-foot apartment building. There will...
Olympia Hotel Apartments Renovation
Plans call for the renovation of an existing affordable residential hotel.